California Medical Facility Vacaville Transformer and Switchgear Install

  • 0
  • June 11, 2011

California Medical Facility Vacaville Transformer and Switchgear Install

Owner: California Department of Corrections and Rehabilitation

Date of Completion: June 2011

Contract Amount: $494,382

Contact: Pete Regan (916) 255-3083

Install two state supplied transformers, state supplied main switchgear, state supplied secondary switchgear, remove interim 5kv panel board with meter, relocate and connect electrical feeder cables for the 64-bed project from the 5kv interim panel board to the new secondary switchgear, and all other required components (contractor supplied) of the electrical distribution system, as well as procuring, installing, terminating, and testing all primary side of the new transformers.

About Koch & Koch Inc

Woman & Minority Business Enterprise
WMBE# 10110114
MeiLung Fore Koch, President

Contact Info

TEL: 530.432.4000
FAX: 530.432.4099
mk@kochinc.com

Mailing Info

P.O. Box 909
Penn Valley, CA 95946

COMPANY INFO

DIR Public Works Contractor 1000005771
CA# 793724 Class. A, B, C10, C21, HAZ

© 2021 Koch & Koch Inc.

  • Home
  • About
  • Services
    • Horizontal Directional drilling
    • Utilities
    • Excavation and earthwork
    • Structural Concrete
    • Electrical
    • Structural Steel
    • Pipe Fusion
  • Work
  • Contact
  • (530) 432-4000