- 0
- April 11, 2011
Foresthill Transfer Station Tipping Wall Repair
Owner: Placer County
Date of Completion: April 2011
Contract Amount: $68,386
Contact: Heather Knutson (530) 886-4987
Installing rectangular tube steel along the back of the tipping wall, installing a structural concrete grade beam with short round tube steel posts in front of the existing steel posts, replacing/repairing a bent tall steel post, sandblasting and recoating all steel members, epoxy injecting cracks in concrete wall, repairing spalls, installing downspout and resurfacing an area of asphalt.
