Mather AASF Fuel Farm Electrical Upgrade

  • 0
  • January 11, 2012

Mather AASF Fuel Farm Electrical Upgrade

Owner: State of California Military Department

Date of Completion: January 2012

Contract Amount: $515,151

Contact: Garth Page (916) 854-3528

Furnish and install a new 150-Ampers, 120/208-Volt, three Phase, circuit breaker in Armory main switch board. Furnish and install new panel boards and new pole mounted flood lights. Remove existing underground duct bank including conduits, power cables from three power operated gates and the Fence Obstruction lights to the electrical room at operation center. Furnish and install new underground duct bank including conduit, power cables for the existing three power operated gates, fence obstruction lights, single mode fiber cable for telephone and new panel board. Furnish and install new 100-Ampere, 120/208, three Phase manual transfer switch. Trenching, back filling, landscape modification and restoring and asphalt pavement patching.

About Koch & Koch Inc

Woman & Minority Business Enterprise
WMBE# 10110114
MeiLung Fore Koch, President

Contact Info

TEL: 530.432.4000
FAX: 530.432.4099
mk@kochinc.com

Mailing Info

P.O. Box 909
Penn Valley, CA 95946

COMPANY INFO

DIR Public Works Contractor 1000005771
CA# 793724 Class. A, B, C10, C21, HAZ

© 2021 Koch & Koch Inc.

  • Home
  • About
  • Services
    • Horizontal Directional drilling
    • Utilities
    • Excavation and earthwork
    • Structural Concrete
    • Electrical
    • Structural Steel
    • Pipe Fusion
  • Work
  • Contact
  • (530) 432-4000