- 0
- December 11, 2012
North Market Force Main Extension & Auditorium Drive Lift Station Replacement
Owner: City of Redding
Date of Completion: December 2012
Contract Amount: $796,435.86
Contact: Ron DeMaagd (530) 225-4170
Transition piping and valving required to extend the existing 16” HDPE sanitary sewer dual force main into one 18” fusible PVC force main using the existing 24” CMP gravity sewer line. Replace existing package lift station with a new 200 GPM package lift station, including a new control panel and electrical gear.
