Koch & Koch Inc
  • Home
  • About
  • Services
    • Horizontal Directional drilling
    • Utilities
    • Excavation and earthwork
    • Structural Concrete
    • Electrical
    • Structural Steel
    • Pipe Fusion
  • Work
  • Contact
  • (530) 432-4000

Penn Valley Dual Force Main

  • 1
  • April 24, 2018

Penn Valley Dual Sewer Force Main

Owner: Nevada County Sanitation District No. 1

Date of Completion: April 24, 2018

Contract Amount: $7,720,033.70

Contact: Brad Torres (530) 265-7103

Furnish all labor, materials, tools, and equipment for construction of a new lift station located in the Penn Valley community, dual 6-inch force mains from the lift station to the Lake Wildwood wastewater treatment plant (LWW WWTP), an energy dissipater manhole, a new influent sewer at the LWW WWTP, a new grit removal system at the LWW WWTP, a new headworks odor control system at the LWW WWTP and required site grading, site piping, electrical improvements, instrumentation and control improvements, miscellaneous site and facility improvements, mobilization/demobilization, traffic control, sheeting/shoring/bracing, stormwater SWPPP & implementation, and all associated work.

a115i2cQ
BwyPSfOg
FcJqu7Cg
hW_0DfjQ
j6iUeOEw
Lgis5krw
Lxe8qaqw
N_FLi8uw.jpeg
NZMbKQqg
oj8XkGTg
QR7m1Rhw
TeDbQowA
wGzgWEkw
x3xrRHEw
zwVZDL5g

About Koch & Koch Inc

Woman & Minority Business Enterprise
WMBE# 10110114
MeiLung Fore Koch, President

Contact Info

TEL: 530.432.4000
FAX: 530.432.4099
mk@kochinc.com

Mailing Info

P.O. Box 909
Penn Valley, CA 95946

COMPANY INFO

DIR Public Works Contractor 1000005771
CA# 793724 Class. A, B, C10, C21, HAZ

© 2021 Koch & Koch Inc.

  • Home
  • About
  • Services
    • Horizontal Directional drilling
    • Utilities
    • Excavation and earthwork
    • Structural Concrete
    • Electrical
    • Structural Steel
    • Pipe Fusion
  • Work
  • Contact
  • (530) 432-4000