Installation of a new 800KW emergency generator and the electrical infrastructure required to support the install including automatic transfer switch, load bank and distribution panel. The new generator was housed within an enclosure and was connected to PG&E on the site – increased emergency power capacity by thirty-five percent. Neuroscience Center’s electrical improvements included aluminum wires at the main electrical rooms. Work included the relocation of the existing undersized 50KW emergency generator from the Center to the Annex’s fenced enclosure.